Installation of AOS/K12 drying line is completed

来源:
时间: 2022-05-25

The 2 sets of K12/AOS drying production lines designed and constructed by Meibao have been installed and entered the commissioning stage.


   


   


   


   


Copyright © 2016 20180829.All Rights Reserved ——浙ICP备17046615号-1 Rhinoceros cloud services 犀牛云提供云计算服务