Waste gas incinerator for rock wool production line put into operation

来源:
时间: 2022-08-23

The two waste gas incinerators for rock wool production line built by Meibao have been put into operation recently, which greatly reduces the natural gas consumption of the production line. A single waste gas incinerator saves about 1.5 million yuan in natural gas fuel annually. The waste gas incinerator for rock wool production line of Meibao has been used by more than 50 users at home and abroad, and the energy saving effect is very obvious. Especially in the current situation of rising global energy prices, it is more necessary to use waste gas to save energy and reduce consumption.


   


Shelly zheng
Head of International department 
Email: shelly@cnmbl.com / mbl@cnmbl.com
Zhejiang Meibao Industrial Technology Co.,Ltd. 
Whatsapp & Wechat & Skype & Phone Number: +8618757134118
Office Address: Total 14th Floor, ZMI Plaza, Kaixuan Road, Hangzhou, 310020, China.
Factory Address: No.150 Xinan Town,Deqing ,Zhejiang,China
High efficiency / Energy saving / Environmental protection

Copyright © 2016 20180829.All Rights Reserved ——浙ICP备17046615号-1 Rhinoceros cloud services 犀牛云提供云计算服务